Home > Buy Now > Construction Material Making Machinery > Other Construction Material Making Machinery > Discontinuous PU Sandwich Panel Line
 


China Sanxing Machinery Manufacture and Project Construction Co.,Ltd
 
icon K-span Roll Forming Machine
icon sandwish panel line
icon Flat Sheet Roll Forming Machie

line

icon Company Profile
icon Selling Leads

line

 
Contact us
China Sanxing Machinery Manufacture and Project Construction Co.,Ltd
[China]
Address:
no.4yongshengli road zhanqian area Yingkou Liaoning 115000 China
Phone:
86-0417-2604444
Contact name:
kobe xu , salesman
Inquire now










China Sanxing Machinery Manufacture and Project Construction Co.,Ltd



 
sandwish panel line

Discontinuous PU Sandwich Panel Line

Inquire now

Discontinuous PU Sandwich Panel Line

Click to enlarge image

 Origin China
 Brand Name sanxing

Continuous production line of

 rigid polyfoam PU color-steel-sided sandwich panels

1.Purpose of the line

The line is used to continuously make PU-cored sandwich panels with the facing layers of steel or aluminum sheet or PU-cored sandwich panels with one side of color steel and the other side of flexible sheet. It is also able to make panels of different profiles if the roll-forming machine is changed.

    2. Main technical parameters

    Specification of the panel                   700~1000mm (width)

                                            30~150mm (thickness)                                           

Length to be custom-made

Production speed                         3~8m/min

Length of belt laminator                   24m

Max temperature of hot-air circulation        70��/span>

Dimensions of the line                     about 86,000×7,000×3,800mm(L×W×H)

Total electrical capacity                    about 207kw

Power of hot-air furnace                    200000 kcal.

3. Constituents of the line

The line is consisted of two decoilers, two hydraulic clipping machines, two forming machines, two film-covering installations, one PU foaming machine unit, one mobile injector, one pre-heating installation, one double-belt laminator, one set of plastic blocks supporting corrugation skin, one hot-air circulator, one set of side chemical stopper, one automatic cutting machine, roller conveyor, steel platform, powered roller conveyor and auto control etc..



icon   Price Condition FOB   Dalian
icon   Delivery lead time within 20 days after receiving 30% prepayment
icon   Minimum order 1set
icon   Supply ability 20 set/month

Inquire now